Commit Graph
2 Commits
Author SHA1 Message Date
sam cb2ca07d0b feat(statestore): CancelExecution, and one cancel path for daemon stop and operator actions
Plan item 5 of docs/prds/execution-tree-state-machine.md (archie-core-1217).
Until now a stop was a context cancel plus a caller-side transition, and the
step rows a worker still held running could never be told: the execution moved
while the work carried on, and the old interrupt-first ordering existed only
because the record could not defend itself. The step table can: the PRD's
ordering -- the store is the record, the context cancel is the delivery --
became safe the moment a worker's next step write fails ErrStaleTransition
against a cancelled step.

- storecontract.ExecutionCanceller and the CancelExecution RPC: one
  transaction moves every non-terminal StepExecution of the execution's
  current attempt to cancelled (one event row each, in the same
  transaction), and the execution itself to the status the operator action
  names, under the shared transition table with its audit row. Staleness is
  decided before legality, the way guardTransition decides it. Earlier
  attempts are never rewritten. Deliberately administrative: the
  deny-by-default grant rule covers it, pinned by a test.
- taskactions.Service routes stop, cancel, abandon and reject through it and
  the old Transition/CancelTask combinations are deleted; the daemon's
  in-memory cancel is demoted to the delivery hook the PRD names, called
  after the store record.
- The gateway's chat controller records first and delivers second, the same
  order, and records even when no runtime is wired here (a standalone
  gateway cannot reach the daemon's goroutines): the record is what unsticks
  a lost-cancel task, and the delivery is best effort. StopRunning and
  TaskRuntime.CancelRunningTasks are deleted outright -- no production
  caller remained once the task_action tool owned stopping, and the daemon's
  CancelRunningTasks/runningTasks.stopAll go with them.
- The gateway's chat adapter writes through CancelExecution instead of a
  bare Transition, so chat /cancel and the dashboard's action service land
  on the same path.

PRD decisions recorded here:
- Each cancelled step's event row is stage_finish with {cancelled: true} and
  the reason as its detail -- the exact-one-event-per-step-transition rule
  covers the pending -> cancelled transition too, even for a step that never
  ran.
- A parked cancel carries the needs_human class, matching the Transition
  path this replaces; the transient class stays with parkRunningTask's
  unwind parks, which now meet ErrStaleTransition for cancelled runs and are
  ignored there.
- Cancelling a wait:true callee is deferred to #1216's agent-call children:
  the callee's own tree and the wait flag are what make
  "cancelling a caller cancels each callee it waits on" decidable, and the
  callee writes it cannot fake are this issue's half of the contract.
- RecoverStale's interrupted sweep is plan item 6, untouched here.
2026-09-27 06:34:01 +10:00
sam fa4566fb0d feat(statestore): step_executions, StartStep/FinishStep under the run credential
Plan item 3 of docs/prds/execution-tree-state-machine.md (archie-core-1220), on
top of the transition tables and ErrIllegalTransition enforcement (1214/1215,
archie-core-qdbo.5):

- Migration 0017 adds step_executions -- id, org_id, workspace_id, execution_id,
  attempt, parent_id, depth, kind, name, called_execution_id, status, detail,
  tokens_used, started_at, finished_at, indexed on (execution_id, attempt, id).
  Ownership fields are stamped from the execution's row; depth is derived from
  the parent, never supplied by a caller. Existing rows gain no backfilled
  steps.
- task.Store (the workflow engine's mid-run facade) gains StartStep/FinishStep
  (5 methods, within the 8 cap), with storecontract.StepRecorder fronting them
  on the server; deadlineStore wraps both with its per-call timeout.
- The store enforces each write as one transaction: the guarded row write
  under the shared step transition table plus the transition's own
  stage_start/stage_finish event row. Staleness is decided before legality,
  the way guardTransition decides it, and the store returns the persisted
  event for the caller's post-commit publish -- the EmitDurable convention
  (the daemon's event sink skips already-persisted rows by assigned ID), which
  is why workflow.Run stops emitting stage events beside the store and no
  longer discards step-write errors: a failed start or finish parks the
  execution, and the stage does not run unrecorded. An interrupted stage
  records interrupted rather than failed; a recording failure on that
  shutdown path is logged and left to RecoverStale, which owns the
  interrupted-execution sweep in plan item 6.
- The run credential of docs/prds/orgs-and-access.md authorises StartStep and
  FinishStep on its own execution only: both requests carry the execution ID
  the grant check verifies (FinishStep carries it because the interceptor
  never reads the database), and FinishStep verifies handler-side that the
  step really is that execution's. authorizesTaskScopedCall's sanctioned
  widenings are now held as a lookup table so the next one stops growing a
  switch.
- The PRD's wire contract is StartStep(execution, attempt, parent, kind, name)
  -> step id; the responses also carry the persisted event (needed for the
  post-commit publish) and FinishStep's request carries execution_id (needed
  for the grant check) -- both noted here as deliberate additions to the PRD's
  shorthand. called_execution_id exists in the table but not yet on the wire:
  its named consumer is the workflow-call recording of plan item 4 (#1216).

Conformance drives both adapters; grant tests pin the own-execution scoping;
the wire sentinel set gains ErrInvalidStep (InvalidArgument, "step execution
invalid") for a step kind no consumer names.
2026-09-27 05:42:32 +10:00