Missed in f800e1d, which ported internal/worktree but stopped at "the
sibling package still compiles".
Both NATS handlers ran their work under context.Background(). The client
side has a Timeout and passes a context, but the server discarded it, so
a prepare or push ran unbounded. That was survivable when the work was a
git child process that could be killed; after f800e1d it is an in-process
go-git clone, so an unresponsive forge wedges the handler goroutine
permanently. Removing the per-repo object cache in that same commit made
clones longer, which widens the window further.
Server now has a Timeout (defaulting to 15 minutes, sized for a large
clone over a slow link) applied via handlerContext, with a table test
asserting both the explicit and default paths produce a bounded deadline.
The fixtures also still shelled out to git, so every test in the package
skipped when no git binary was present and the helpers tripped noctx.
Rebuilt on go-git to match internal/worktree's suite, including pinning
commit.gpgSign=false on the seed repo so fixtures do not inherit signing
from the host's global config.