Workflow steps retry with backoff on the durable engine #2040
Notifications
Due Date
No due date set.
Blocks
Reference: sam/archie#2040
Reference in new issue
Block a user
Child of #2037. Plan: workflow vocabulary on the durable engine, one requirement per child.
retry: {attempts, backoff}runs a failed step again; each attempt is journaled and the backoff is a durable sleep that holds no worker.Done when: a step failing then succeeding is recorded as two attempts and the run resumes correctly after a restart mid-backoff.