Defer open issues off the day-2 demo path #2000

Closed
opened 2026-11-14 14:42:50 +00:00 by sam · 1 comment
Owner

Label deferred every open issue that isn't on the day-2 demo's path, so the backlog shows only what the demo needs. Issues that contradict the plan are closed separately.

Done when: every open issue is either a child of the day-2 epic, needed by one, a live bug that blocks or loses work, or labelled deferred.

Label deferred every open issue that isn't on the day-2 demo's path, so the backlog shows only what the demo needs. Issues that contradict the plan are closed separately. Done when: every open issue is either a child of the day-2 epic, needed by one, a live bug that blocks or loses work, or labelled deferred.
sam added the choremedium labels 2026-11-14 14:42:50 +00:00
sam added a new dependency 2026-11-14 14:43:00 +00:00
Author
Owner

Labelled deferred the 184 open issues that aren't children of the day-2 epic, needed by one, or a live bug that blocks or loses work: the old services' features, bugs and chores, the older epics, and the two newest off-path issues (operator read surface, the forge retry bug). None of them was a critical or high bug. Deleting the old MCP path is the epic's own work, so it is now linked as a child instead of deferred.

Labelled deferred the 184 open issues that aren't children of the day-2 epic, needed by one, or a live bug that blocks or loses work: the old services' features, bugs and chores, the older epics, and the two newest off-path issues (operator read surface, the forge retry bug). None of them was a critical or high bug. Deleting the old MCP path is the epic's own work, so it is now linked as a child instead of deferred.
sam closed this issue 2026-11-15 17:26:35 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Reference: sam/archie#2000