Track the concrete worktree-package defects proven by the 2026-08-22 evidence-gated review. Child bugs cover RPC authority/path containment, repository-key isolation, retry/base/diff correctness, push lifecycle, terminal cleanup, cancellation, and branch naming. This epic groups implementation only; each child has its own observable acceptance criteria.
Acceptance criteria
All child bugs are closed with red-green regression tests, scoped lint passes, and the repository quality gate is clean.
Close reason
All 9 children complete. The P0/P1 trust-boundary and correctness defects (.1 RPC task binding, .2 colliding directory keys, .3 untracked cleanup, .4 fail-closed base resolution, .5 three-dot merge-base semantics) were already fixed on main and reconciled 2026-08-24. The remaining four (.6 push result, .7 no-change worktree leak, .8 commit cancellation, .9 branch naming contract) were implemented this session, merged as 474c31d and its two merge commits, task check green, with an independent adversarial review reporting zero findings.
Imported from beads archie-core-1ysw · GitHub #590 · type epic · priority P0 · created 2026-08-22 · closed 2026-08-24
Track the concrete worktree-package defects proven by the 2026-08-22 evidence-gated review. Child bugs cover RPC authority/path containment, repository-key isolation, retry/base/diff correctness, push lifecycle, terminal cleanup, cancellation, and branch naming. This epic groups implementation only; each child has its own observable acceptance criteria.
### Acceptance criteria
All child bugs are closed with red-green regression tests, scoped lint passes, and the repository quality gate is clean.
### Close reason
All 9 children complete. The P0/P1 trust-boundary and correctness defects (.1 RPC task binding, .2 colliding directory keys, .3 untracked cleanup, .4 fail-closed base resolution, .5 three-dot merge-base semantics) were already fixed on main and reconciled 2026-08-24. The remaining four (.6 push result, .7 no-change worktree leak, .8 commit cancellation, .9 branch naming contract) were implemented this session, merged as 474c31d and its two merge commits, task check green, with an independent adversarial review reporting zero findings.
---
_Imported from beads `archie-core-1ysw` · GitHub #590 · type epic · priority P0 · created 2026-08-22 · closed 2026-08-24_
sam
added the criticalepic labels 2026-10-27 13:38:40 +00:00
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Track the concrete worktree-package defects proven by the 2026-08-22 evidence-gated review. Child bugs cover RPC authority/path containment, repository-key isolation, retry/base/diff correctness, push lifecycle, terminal cleanup, cancellation, and branch naming. This epic groups implementation only; each child has its own observable acceptance criteria.
Acceptance criteria
All child bugs are closed with red-green regression tests, scoped lint passes, and the repository quality gate is clean.
Close reason
All 9 children complete. The P0/P1 trust-boundary and correctness defects (.1 RPC task binding, .2 colliding directory keys, .3 untracked cleanup, .4 fail-closed base resolution, .5 three-dot merge-base semantics) were already fixed on main and reconciled 2026-08-24. The remaining four (.6 push result, .7 no-change worktree leak, .8 commit cancellation, .9 branch naming contract) were implemented this session, merged as 474c31d and its two merge commits, task check green, with an independent adversarial review reporting zero findings.
Imported from beads
archie-core-1ysw· GitHub #590 · type epic · priority P0 · created 2026-08-22 · closed 2026-08-24