Commit Graph
8 Commits
Author SHA1 Message Date
sam dbaa7284a3 feat(taskactions): archive reaps the task's worktree; cleanup test models a completed run
A worktree terminal cleanup keeps (uncaptured or unreadable work) now has a
reap path: archiving calls Daemon.RemoveWorktree for the owning identity's
trees, and the keep logs name archive as the way out. The no-change cleanup
test reports completed through one direct transition instead of reaching
merged via a faked pr_open hop.
2026-09-27 13:38:12 +10:00
sam 30211478c2 test(taskstate): seed fixture task states along the transition table
The execution transition table refuses most of the pairs shipped fixtures
wrote to build a finished task -- running -> merged, queued -> parked,
queued -> waiting_human, queued -> merged -- so those fixtures fail the
moment the store enforces it.

internal/taskstate/taskstatetest seeds a status by walking the table's
legal edges (shortest route, computed from taskstate.CanTransition), so a
fixture cannot write an illegal pair and fails loudly when no route
exists. The fixtures in internal/daemon, internal/app/archied,
internal/webui and internal/infrastructure/postgres go through it, and
the table's own test names running -> merged as refused.
2026-09-26 04:01:08 +10:00
sam 4e9b30d712 fix(daemon): keep a terminal worktree that holds uncommitted work
The cleanup added for no-change runs removed a `completed` task's
worktree whenever it had no PR. agent.run also ends its workflow
`StatusCompleted`, and it works in a real clone whose uncommitted edits
are the deliverable, so the status alone was enough to delete the work:
no commit, no push, no other copy of those edits anywhere.

Cleanup now reads the worktree first and skips a dirty one. A worktree
whose status cannot be read is kept too -- a wrong keep costs disk, a
wrong delete costs the work -- while one that is not on disk has nothing
to keep. The lifecycle fixtures prepare a real clone now, which is the
only shape the daemon ever cleans up, and the cancelled-context test
still cancels only the cleanup call.
2026-09-26 04:01:08 +10:00
sam 8ba0b90861 feat(taskstate): end no-change runs as completed and clean their worktrees 2026-09-26 04:01:08 +10:00
sam ae552db7e0 refactor(store)!: remove the SQLite task store, the PocketBase event store and the SQLite session store
The State Store, event capture and Gateway conversations already serve from
PostgreSQL. This deletes internal/store and internal/infrastructure/edastore,
the SQLite gateway session store and openProductionTaskStore, and the -db
recovery path on a legacy task file; backup, restore, validate and rollback
work on the database database_url names.

- The binding-secret cipher moves to internal/infrastructure/bindingcipher and
  ToolCall to internal/infrastructure/postgres.
- NewSessionStoreMemory is now a pure in-memory store that passes the shared
  SessionStore conformance suite.
- Tests run against PostgreSQL through internal/infrastructure/postgres/pgstore;
  legacyimport/legacyfixture writes the legacy files the import and the boot
  gate read.
- The cron dialect is owned in internal/domain/scheduling, so
  github.com/pocketbase/pocketbase and pocketbase/dbx leave go.mod.
  modernc.org/sqlite stays for the one-time import (legacyread).
- The UI and Messaging architecture gates ban the Postgres and legacy readers
  in place of internal/store.
2026-09-24 14:43:50 +10:00
sam 05529d48d5 refactor(state-store): cut daemon/Gateway over to the remote State Store (archie-core-8cda.4.6) (#774)
* refactor(state-store): delete NATS storerpc; agent store is gRPC-only (archie-core-8cda.4.6)

The agent is fully on the gRPC State Store contract, so the legacy NATS
storerpc path is dead (docs/prds/state-store-contract.md §12 step 4):
- delete internal/storerpc (Server, Client, subjects) and its tests
- drop the storerpc registration from registerTaskRPCServers and the
  now-unused store param
- make the agent transport's State Store URL required and Store() return
  only the gRPC staterpc.Client (no NATS fallback)
- rework agentworker/agent transport tests to back the store with a real
  gRPC State Store server instead of the deleted NATS storerpc server

The agent binary now fails fast when STATE_STORE_URL is absent. Agent store
calls (workflow.Store) go over gRPC to the archie-state-store service.

* refactor(state-store): delete daemon/gateway in-process store ownership (archie-core-8cda.4.6)

The daemon and gateway no longer open archie.db in-process: the single SQLite
file is owned by the standalone archie-state-store process, and both consumers
dial its gRPC State StateStore contract (docs/prds/state-store-contract.md
§12 step 7, no dual-store ownership).

- openStores no longer opens the production task store or seeds b.st; it only
  wires secrets/forge and the gateway conversation store
- openStateStoreAdapter now requires [services.state].target (the old local
  default is deleted) and resolves b.stateStore as the remote *staterpc.Client
- delete the in-process startStateStoreServer (the multiplexed gRPC server and
  its per-task bearer-token registry) from the daemon composition
- RunGateway now resolves the same remote State Store adapter; its session
  SQLite stays Gateway-owned and untouched
- daemon.ConnectedStateStore carries the configured target plus the resolved
  bearer token, which containerEnv injects as STATE_STORE_URL / STATE_STORE_TOKEN
  so archie-agent authenticates to the same remote service
- readiness store probe reads b.stateStore

PRD-consistent choice (noted): with the in-process server gone, per-task token
generation is removed; the daemon/gateway/agent all present the single
[services.state].target_token (or STATE_STORE_TOKEN secret) that the standalone
store validates.

* docs(webui): require [services.state].target in config and deployment templates (archie-core-8cda.4.6)

After the in-process store path is deleted, archied and archie-gateway dial the
standalone archie-state-store gRPC service via [services.state].target and never
open archie.db themselves (docs/prds/state-store-contract.md §12 step 7).

- config.example.toml documents [services.state].target as required, with the
  loopback vs Docker-bridge gateway + target_token rule
- deployment templates set [services.state] per topology: bridge gateway +
  token for container-mode agents, loopback for host-only
- deployments/README.md and systemd-user-service.md describe start commands
  for both topologies and drop the stale "not yet consumed by the daemon" note

* style: gofumpt alignment for State Store daemon literal; appease noctx/staticcheck (archie-core-8cda.4.6)

* docs(state-store): refresh stale in-process references post-cutover (archie-core-8cda.4.6)
2026-09-07 05:06:12 +10:00
sam 5c0efaceaf refactor(workflow): relocate Task/Status/Source and define workflow.Store (#754)
* refactor(workflow,store): relocate Task/Status/Source and define workflow.Store

Move store.Task, store.Status*/store.Source*, and the 3-method workflow
store interface out of internal/store into internal/domain/workflow as
workflow.Task/workflow.Status/workflow.Source plus a consumer-owned
workflow.Store, superseding store.WorkflowStore. internal/domain/workflow
now imports zero internal/store symbols; internal/store persists the
domain type instead (infrastructure depends on domain), and its Store
satisfies workflow.Store.

Updates every production and test caller of the relocated symbols across
daemon, webui, gateway, agentworker, agenttransport/nats, storerpc,
taskrun, and worktreerpc, and removes TestRecordDispatchViaExplicitTx per
docs/prds/state-store-contract.md (rev. 2c) sections 4 and 12 step 2.

Two workflow-package integration tests that exercise the real *store.Store
move to an external workflow_test package (store_integration_test.go) to
avoid a workflow(test)->store->workflow(prod) import cycle now that store
depends on workflow.

* no-mistakes(document): docs(state-store): mark §4.8 relocation done in state-store-contract
2026-09-07 00:39:26 +10:00
sam fa7b70225a fix(daemon): clean worktrees on terminal no-change task completion
Tasks completing with BuildNoChanges transitioned directly to StatusMerged
without opening a pull request, bypassing the only production worktree
cleanup path inside reconcilePRs (which only queries StatusPROpen tasks).
As a result, every no-change task leaked a full git clone on disk.

Clean up the identity-correct worktree on terminal non-PR completions:
- In daemon.process, invoke cleanupTerminalTaskWorktree using the task's
  identity-resolved worktree manager when the task reaches a terminal
  status (Merged/Rejected/ClosedWontDo) with PRNumber == 0.
- Ensure parked tasks and open-PR tasks retain their worktrees for
  post-mortem triage and PR reconciliation respectively.
- Add lifecycle regression tests in internal/daemon/terminal_cleanup_test.go.
2026-08-24 18:04:43 +10:00